ApplicationsFull Plans or Building Notice: which should you choose?
Two ways to get Building Regulations approval, and why the quicker one can cost you more.
Read more →
When you apply to building control, there are two main routes: a Full Plans application or a Building Notice.
Full Plans
Your detailed drawings are checked and approved before work starts. Your builder knows exactly what to build, can price it accurately, and there are no surprises on site.
Building Notice
Work can start without your plans being checked first, and the inspector checks everything on site as it goes. It can be quicker for small, simple jobs, but if the inspector isn't happy with something, they can ask you to change it, take it down or redo it, even if it's already built.
Our advice
Even with a Building Notice, have proper drawings. They show your builder how to comply with every part of the regulations, from structure (Part A) to insulation and energy (Part L). For most extensions and loft conversions, Full Plans gives you the most protection.